Tuesday, 5 November 2013

Assignment 2: Task Five - Pre Production Planning Shooting Schedule


Shooting Schedule

Day
Scene
Location
Equipment
Costumes
Props
Cast +Crew
1


1


1


1


1
1


2


3


4


5
My house


My house


My house


My house


My house
Camera
Tripod

Camera
Tripod

Camera
Tripod

Camera
Tripod

Camera
Tripod
None


None


None


None


None
Play dough

 Play dough

 Play dough

 Play dough

 Play dough
Myself


Myself


Myself


Myself


Myself

Assignment 2: Task five - Pre Production Planning Shot List


Shot List

Scene
Shot Number
Description
‘Kids’ forming



The 4 forms



The shapes will form


The outline of the logo will form.


The ident will fade into blackness
1



2



3



4



5
The ‘Kids’ in the 4Kids logo will form from play dough. With the other strands still wiggling.

The 4 in the 4Kids logo will form from play dough. With the other strands are still wiggling.

The shapes of the 4Kids logo will form from play dough. With the remaining strands are still wiggling.

The remaining strands will come together to form the outline of the 4Kids logo.

The ident will fade black.

Friday, 25 October 2013

Assignment 2: Task Five - Production Schedule Production Budget


Production Budget


Item
Cost
Play dough
Camera Hire
Tripod Hire
£3.50
£35
£15

Total Production Budget:
£53.50

Assignment 2: Task Five - Production Schedule Risk Assessment



Risk Assessment

Group Members: Jordan Fricker                                       Location: 6 Davington Road
Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N
Fire
Everyone in the house
1
5
3
No open fires during time of filming.
Yes
Power Cuts
People in house
1
1
1
Make sure there is not to much electronic equipment plugged in.
Yes
Trip Hazards
Crew
2
2
2
Make sure there are no wires around for someone to trip over.
Yes
Animals attacking
Crew
1
5
3
Make sure there are no vicious animals in the vicinity.
Yes

Contacts
Emergency Service: 999
Robert Clack School:

Other Contacts: 07914771244



Assignment 2: Task Five - Production Schedule Contingency Plan


Contingency Plan
Name: Jordan Fricker

Production: 4Kids Ident

Potential problems and how to overcome these problems:

If all goes wrong for filming at home then there is a possibility I could film in the school where there is none of the possible hazards of filming in my other location. The only major problem that could arise while filming in a school, but highly unlikely, is a fire starting. So therefore if the hazards of filming at my original location arise then i could film in the school because it would be easy to acess and there would be less hazards.

Assignment 2: Task Five - Production Schedule Contact Details


Production Schedule
Cast and Crew Contact Details

Programme Title: 4Kids Ident
Client: Channel 4
Writer: Jordan Fricker
Date: 25/10/13


Name/Role
Mobile Telephone Number
Home Telephone Number
Jordan Fricker – Everything
07914771244
02082524521

Assignment 2: Task Five - Production Schedule Call Sheet



Production Schedule
Call Sheet

Programme Title: 4Kids Ident
Client: Channel 4
Writer: Jordan Fricker
Date: 25/10/13
CREW

Camera: Jordan Fricker

Production Assistant: Jordan Fricker

Sound: Jordan Fricker

Transport: Jordan Fricker

Props: Jordan Fricker

Others: Jordan Fricker

Meeting at: 6 Davington Road

Location Venue: 6 Davington Road

CALL DATE: 29/10/13

CALL TIME: 12:00pm

Transport: Bus

INSTRUCTIONS: 128 to Green Lane and then 368 to Barking

Actors: No one
Make – up: No one
Wardrobe: No one
Location Catering: No one

Notes: None